Don't Forget About Permits

5/4/2023

0 Comments

 
Picture
Permits are needed for almost any kind of residential construction that involves a new structure (home or outbuilding), addition or significant alterations.  The number of permits needed and the time that it takes to get them (as well as the cost) can be quite significant and should be factored into the project.

A simple remodeling project may require only a building permit from the municipality, which may take a week or less to obtain.  A new home on an urban or suburban lot typically also requires a zoning permit from the municipality, which may add a couple of weeks or more.  However, certain factors can require more extensive permitting.  Waterfront properties or properties in flood plains, rural properties, properties in special scenic areas, or sites which require a lot of land disturbance may all require additional permits.   

The project discussed in my last blog post - "Town of Wyoming Family Home" - is requiring an unusually large number of approvals before construction can begin.  Part of the reason is that the homeowners are subdividing and rezoning their rural parcels, which are too small to comply with the current requirements for the zoning category that they are in.  Other factors:  the property is in a municipality which wants to maintain its rural character and is therefore careful about allowing homeowners to change zoning if it will potentially take farmland out of production.  The municipality also aims to reduce the visibility of new construction. Furthermore, the property is within the scenic Lower Wisconsin Riverway.  And finally, the amount of land that is being disturbed in order to build the home and the long driveway requires approval from the Wisconsin Department of Natural Resources.  

Here are the permits and approvals required for this project:
  • Approval from the town for land division, rezoning, driveway access, internal driveway design and building siting.  The driveway was required to be designed by an engineer because of the steepness of the site.
  • Approval from the county highway department for the location of the private driveway/public road intersection, making certain that it is not too close to neighboring driveways or to major intersecting roads.
  • A permit from the Lower Wisconsin Riverway Board:  because the property is within the Lower Wisconsin Riverway, the LWRB had to determine whether the home will be visible from the Wisconsin River (it won't be).
  • A sanitary permit from the county:  any home which will have a septic system requires a sanitary permit from the county.  Because this home will have an at-grade system, it also requires approval from the state.
  • Approval from the county for the land re-division and re-zoning.
  • A zoning permit from the county
  • A Wisconsin Department of Natural Resources construction stormwater permit:  this is because of the amount of ground that will be displaced during construction of the road and home
  • Finally, a building permit from the town.

If the property had been adjoining a lake or river or if it had been in a floodplain, it would have needed additional approvals as part of the county zoning process.

Some of these permits cannot be obtained until previous ones have been granted.  For example, the county could not grant the re-zoning approval until the town had approved it.  The zoning permit cannot be obtained until a sanitary permit has been granted.  The town will not approve the building permit until the county zoning permit is in place.  

By working to obtain as many permits at the same time as possible, we should have them all in approximately 4 months from the start of the process.  Without the land re-division and re-zoning, it would have taken approximately 2 to 2-1/2 months, assuming that everything went smoothly. Providing inadequate information or not meeting the permit requirements can delay the process if the applicant needs to provide additional information or if parts of the project need to be re-designed. This is particularly true for those permits which are granted by a board which only meets once a month, as the board's decision will be delayed until the following month.  Processing times for permits may increase during particularly busy construction periods, such as in the spring.

If the time for permits is not factored into the process, it could result in an unexpected delay to the project.  Unfortunately, this can mean that construction anticipated to start in the fall may have to be delayed until the following spring, since our climate makes it difficult to start projects in December through March.

0 Comments

Your comment will be posted after it is approved.


Leave a Reply.

    RSS Feed

    Categories

    All
    Essentials
    Good To Know
    Projects
    Working With An Architect

    Archives

    April 2025
    January 2025
    November 2024
    October 2024
    September 2024
    July 2024
    June 2024
    April 2024
    February 2024
    November 2023
    July 2023
    May 2023
    March 2023
    February 2023
    November 2022
    October 2022
    September 2022
    August 2022
    June 2022
    April 2022
    March 2022
    January 2022
    November 2021
    September 2021
    July 2021
    June 2021
    May 2021
    April 2021
    March 2021
    February 2021
    December 2020
    November 2020
    October 2020
    May 2020
    April 2020
    March 2020
    January 2020
    November 2019
    October 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    January 2019
    December 2018
    November 2018
    September 2018
    May 2018
    February 2018
    January 2018
    December 2017
    October 2017
    September 2017
    August 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    February 2016
    December 2015
    November 2015
    September 2015
    August 2015
    June 2015
    May 2015
    April 2015
    March 2015
    February 2015
    December 2014
    November 2014
    September 2014
    July 2014
    May 2014
    March 2014
    December 2013
    August 2013
    July 2013
    April 2013
    March 2013
    February 2013
    January 2013
    December 2012
    November 2012
    October 2012
    September 2012
    August 2012
    July 2012
    June 2012
    May 2012

Remodeling and Home Design
 © 2015  /  Julie Kardatzke Architect, LLC  /  408 W. Leeson Street, Spring Green, WI  53588   /   608.588.7105  /  [email protected]
Picture